FUSELAGE - Tail Section

In this section we will be:

  • Install Vertical Stabilizer Fairing 
  • Install Dorsal Fin



Date Started:   10/28/2018                                                   Total Hours:  12 hrs

Status:  In Progress

10/28/2018 - 6 hrs - Fit, layout rivet pattern and match drilled into side skin for Left side Vertical Stabilizer Fairing

10/29/2018 - 6 hrs - Fit, layout rivet pattern and match drilled into side skin for Right side Vertical Stabilizer Fairing