CONTROL STICK TORQUE TUBE INSTALLATION

Installed the control sick assembly

Ready to final rivet the aft control stick to the tube assembly.



Date Started:  01/23/2016                                            Total Hours:  2 

Status:  Complete

1/23/2016 - Control Stick Temporarily in place