FIREWALL INSTALLATION -
STATION #2
Centered the firewall MF03-199over station #2. Marked the firewall and trimmed to fit.
Cut the hat sections for all tubes. Drilled out the rivers holding the flange on bulkhead U2 - MF03-163 and match
drilled the firewall to these holes and matched drilled the engine mount holes.
Cut the station #2 Formers MF03-207 and hat sections to fit.
Date Started: 04/09/2016 Total Hours: 25
Date Finished:
Status: In progress
4/9/2016 - The Firewall panel had to be trimmed to size.
Then drilled out the rivets holding the flange on the U2 bulkhead MF03-163.
Laid out the rivet lines on the firewall then match drilled the firewall and the hat sections. At this time I matched drilled the U2 existing holes with the firewall and matched drilled the holes in the firewall for the engine mount.
Backside view of Bulkhead #2 -
hear you can see the the side formers MF03-207 fitted in place
Note: The extra frame gussets create a challenge when attaching hat sections. On the side of bulkhead @2 there are side gussets which prevent a hat section to wrap around the square frame tube. Here I had to modify a hat section that only covers the backside of the tube. This will be silicone in place then bonded and riveted to the firewall.
10/4/2016 - 4 hrs - Bond with Silicon hat sections and u-channels bond with bulkhead #2, front side in place and cleo.
10/6/2016 - 3 hrs - Bond with Uralane Bulkhead #2
10/9/2016 - 4 hrs - Rivet Bulkhead #2 in place. Note: Didn’t rivet the formers and center b racket these will be b ended and riveted later
10/15/2016 - 2 hrs - Finished Bulkhead #2 - glued and bond Formers with Uralane in plane.
10/16/2016 - 4 hrs - Riveted Bulkhead #2